Design System
4

Proposed Solution

Connect every feature to a client problem they care about.

80%+ Auto-Approve60-80% Human Review<60% Research Needed

Key Insight: Don't just list features. For each component, explain WHY it solves THEIR specific problem. "This panel efficiency means you hit your 87% target" beats "22% efficient panels."

Required Data

Solution Overview

  • Solution name/brand
  • High-level description
  • Key differentiators
  • Why this approach vs alternatives

Components & Specs

  • Equipment/software list
  • Technical specifications
  • Integration requirements
  • Scalability options

Methodology

  • Implementation approach
  • Quality assurance process
  • Risk mitigation strategy
  • Change management plan

Team

  • Project manager profile
  • Technical lead credentials
  • Support team structure
  • Escalation path

Example Preview

Our Solution

Integrated Solar + Storage Solution

We propose a 500kW rooftop solar installation with 100kWh battery storage and our proprietary SmartGrid management platform. This combination directly addresses your three core challenges:

Problem
$420K annual energy costs increasing 12%/year
Solution
500kW system generates 650MWh annually
Outcome
$365K year-one savings, $1.8M lifetime
Problem
Zero renewable energy, customer mandates approaching
Solution
87% self-consumption rate via battery optimization
Outcome
Exceeds Fonterra requirement (80% renewable by Q3 2026)
Problem
No backup power, 2 outages/year average
Solution
100kWh battery provides 4-hour critical load backup
Outcome
Eliminates $85K annual outage risk

System Components

Solar Panels
908x LONGi Hi-MO 6 (550W)
22.3% efficiency, 25-year warranty
Inverters
10x SMA Sunny Tripower (50kW)
98.3% efficiency, remote monitoring
Battery Storage
Tesla Megapack (100kWh)
4-hour backup, 15-year warranty
Monitoring
SolarTech SmartGrid Platform
Real-time optimization, predictive maintenance

Why SolarTech?

  • 47 commercial installations in NZ
  • 3 warehouses of similar scale
  • Local team (Auckland-based)
  • 24/7 monitoring included

Your Dedicated Team

SC
Project Manager
Sarah Chen
PMP, 12 commercial projects
MT
Lead Engineer
Mike Thompson
CEC Accredited, 15 years
JW
Site Supervisor
James Wilson
Local, 8 warehouse installs

Quality Checklist